Spry excels in project management and client support, offering expertise in design evaluations, value management, and innovative engineering solutions.
Client: Rural City of Murray Bridge
Location: Murray Bridge
Contract Value: $2.3m
Description:
The reconstruction of Flagstaff Road was seen as a strategic project for the provision of both Primary and Secondary freight networks through the region and provides a direct linkage between two secondary freight routes (Hoadville Road and Pfeiffer Road) as well as supporting significant operations that provide economic stimulus and employment within the Rural City of Murray Bridge.Works Undertaken:
Liaison and co-operation with service authorities, preparation of management plans and QA, tree removal and associated site clearing, primary earthworks viz, boxing out of roadway, stockpiling of topsoil, filling and compaction, etc. Roadwork’s construction included; sub-grade preparation, road sub-base and base course construction, including block paving, spray seal/asphaltic concrete (hot mix) wearing course including before/after survey, line marking and signage.